Chapter 22: Electrical

Home
Project Web -- Status
Epoxy-Pump Cleaning
Chapters1-3: Introduction
Chapter 4: Fuse Bulkheads
Chapter 5: Fuse Sides
Chapter 6: Fuse Assembly
Chapter 7: Fuse Exterior
Chapter 8: Headrest-etc
Chapter 9: Main Gear
Chapter 10: Canard
Chapter 11: Elevators
Chapter 12: Canard Install
Chapter 13: Nosegear
Chapter 14: Center Spar
Chapter 15: Firewall
Chapter 16: Control System
Chapter 17: Trim System
Chapter 18: Canopy
Chapter 19: Wings
Chapter 20: Strakes
Chapter 21: Strakes & Tanks
Chapter 22: Electrical
Chapter 23: Engine
Chapter 24: Covers & Fairings
Chapter 25: Finishing
Chapter 26: Upholstery
Links
Documents

Planning

Okay, this is fairly early to be thinking about this (at the time I'm writing this, I'm just finishing up Chapter 4!)  
But, since my daytime work involves designing and building GPS and Car Multimedia Systems for
STMicroelectronics (www.st.com), I thought I'd get some ideas down on paper...err, electrons.

Some things I have been thinking about:
Instruments
Navigation Panels
Navigation Strobes